| RV-9A: F-704 Bulkhead - 3/31/2008 Home  Previous Entry  Next Entry  Back
 | 
		  	
			
				| 
						
							| Share on: 
   |  | 
			
				|  Finished drilling all of the 5/8 inch holes I had to drill 12 5/8 inch holes in all.
 
 | 
	
			
				|  Ready to drill the F-904G Vertical Bars What bar? Oh, it's there, under the clap, aligned by 2 bolts in the pre-drilled holes. I drilled two 1/8 inch holes throught the pre-drilled holes in the F-904D.
 
 | 
	
			
				|  Here's the finished product There are some really long rivets that will go in these holes.
 
 | 
	
			
				|  Final drilled all the 1/8 inch holes in all 4 side plates 
 | 
	
			
				|  My kind of squirrel! I took this shot while we were sitting down to lunch! Only brave squirrels (or crazy ones) hang out in my back yard.
 
 | 
	
			
				| Home  Previous Entry  Next Entry  Back 
 
 |