				|  Drilled the floor stiffeners to the F-601J angles on the firewall I feel like a kid with a brand new card-board box, crawling in and out from under the fuselage. It's kind of cool under there. I look back through the fuselage, imaging what it will be like when the airplane is cruising at 6,500 feet on the way to lake to go fishing. Damn, I really need to hurry up! Anyway, back to reality... Here I have final drilled the stifferners to the firewall angles using my pneumatic angle drill.
 
 | 
	
			
				|  Final drilled the stiffeners to the F-983-L&R cover support ribs Same song a dance here.
 
 | 
	
			
				|  Started work on the F-722 and F-724 ribs for the baggage area I starting off by fluting 2 of the ribs.
 UPDATE : 8/30/2009 There are nutplate rivet holes in the F-724's that need to dimpled NOW. The actual nutplates go on later when you attach the F-750 side panels. If you wait till after the skin is on, you will have hell trying to dimple these holes. ALSO: Check your plans. There is a hole that needs to be enlarged for one of those plastic bushings in the F-724's.
 
 | 
	
			
				|  Riveted on the nutplates to the F-722 ribs This is were the Longeron yoke comes in handy for putting in rivets in awkward places.
 
 | 
	
			
				|  Cleced in the vertical rib I had to do a little trimming on the longeron end of these ribs to make them fit.
 
 | 
	
			
				|  Clecoed in the F-722 ribs 
 | 
	
			
				|  Clecoed the F-750 aft baggage side covers to the F-722 and F-724 ribs Hey, I think I'm ready to start riveting the fuselage together!
 
 | 
	
			