| 
			
				|  |  
				| 
						
							| Share on: 
     |  |  |  
				| Started work on the F-902-L&R Forward Bulkheads
 The flanges on these bulkheads have to be fluted in order to make the pre-drilled holes line up with the pre-drilled holes in the outside skin. I also enlarge the pre-drilled hole for the rudder cable with my Unibit.
 
 
   |  |