| 
			
				|  |  
				| 
						
							| Share on: 
     |  |  |  
				| Laid everything out
 After transferring the bolt positions off the ruler onto the tank baffle, I laid out the "Z" brackets over their associated ribs on the back of the baffle. Then I located the W-932DG drill guides that will be used to insure the proper initial drilling of the "Z" brackets.
 
 
   |  |