| 
			
				|  |  
				| 
						
							| Share on: 
     |  |  |  
				| Drilled the Left Elevator trailing edge
 This time I think I know what I'm doing. I raised the trailing edge with a couple of boards until the chord line of the elevator was parallel to the table. I marked the aluminum wedge center line and drilled the holes through the pre-drilled holes in the top skin, through the wedge and then into the bottom skin of the elevator. It came out very nice and uniform.
 
   |  |